OptiVlak d.o.o. · Maribor, Slovenia

Railway consultancy for infrastructure, signalling and freight transport.

We help manage railway infrastructure and signalling projects, plan freight by road and rail together with our partner TOP Hrvatin, and build our own software: Haulio for freight forwarders and Vigila AI for rail maintenance. Small team, experienced people, direct contact.

Scroll
  • Infrastructure projects
  • Cost control
  • Signalling projects
  • Commissioning
  • ETCS / ERTMS
  • Freight forwarding
  • Road & rail freight
  • Intermodal
  • FTL & groupage
  • Transport orders
  • CMR / eCMR
  • eFTI
  • TMS
  • Predictive maintenance
  • AI
Signalling, visualised

Routes, trains and signals: what a signalling project has to deliver

A simulated control-centre screen of a small station. Behind every green route there is a project: design, installation, testing and commissioning.

  1. Route set

    Green: the route is locked for a train. White: a shunting route into the siding.

  2. Occupancy

    Red: a train occupies the section. Sections release one by one behind its tail.

  3. Signals

    A signal clears only once its route is locked, and returns to red as the train passes it.

  4. Simulation, not live data
Railway project consulting

Railway infrastructure and signalling project management

On a railway project, cost and schedule are lost in the details: quantities, change orders, installation sequences and track possessions. We help contractors, infrastructure managers and suppliers keep infrastructure and signalling projects under control, from planning to commissioning.

Where we help

  • Project management. Planning, progress tracking and coordination between design, site and suppliers.
  • Cost control. Analytical cost control: budget against actuals, quantities, forecasts and change orders.
  • Production and installation. Sequencing of works, installation follow-up and the interfaces between civil works, track and signalling.
  • Signalling projects. Project and cost management, and support for testing and commissioning.
  • Tender support. Technical and cost input for bids in Slovenia, Croatia, Serbia and the region.

Our experience

More than 8 years on European railway infrastructure and signalling projects, delivered under CENELEC standards, TSI CCS, ETCS/ERTMS and the national rules of each network.

What you receive

// cost report (example) Illustrative data
Work packageBudgetActualForecastVariance
Track works 100 %64 %98 %−2 %
Signalling 100 %41 %107 %+7 %
Catenary 100 %52 %101 %+1 %

A clear view of where the project stands: what is spent, what is committed and where it will end. Every deviation with its cause and a proposed action.

Tell us about your project Remote, or on site by arrangement.
Freight transport planning · with TOP Hrvatin

Road, rail or intermodal? We plan your freight with real prices

Rail is often cheaper and greener, but not always: the last mile, the terminal cut-off or two departures a week can kill the business case. Together with TOP Hrvatin, the forwarder run by our co-founder Jure Hrvatin, we compare road, rail and intermodal for your lanes with prices from the market, and tell you what you could save.

One lane, two ways Road FTL Rail + truck
KoperRijekaLjubljanaMariborZagrebGrazViennaMunichBudapest
Example lane Koper → Munich. Schematic map; routes are illustrative. Illustrative data

Your lane assessment

OptionDoor-to-doorTransitDeparturesCO₂
Road FTL € quotedaysdailykg / load
Intermodal (rail + truck) € quotedaysper weekkg / load
Rail wagonload € quotedaysper weekkg / load
One table per lane, filled with current quotes from operators and carriers. Plus the risks: terminal cut-off times, equipment availability and what happens when a train runs late.

What we need from you

  • Your main lanes: origin, destination and loads per week.
  • Cargo and equipment: trailers, containers or swap bodies.
  • How flexible your delivery times are.

Why this partnership works

  • TOP Hrvatin, run by our co-founder Jure Hrvatin, organises the transport: carriers, terminals and real prices from daily operations.
  • OptiVlak brings the technology: with Haulio, every request, quote, transport order and CMR of your loads is handled and tracked in one place, so you see status and costs without chasing emails.
  • If the numbers work, we run a pilot on one lane before you change anything else.
Send us one lane Koper, Rijeka, Ljubljana, Zagreb, Belgrade and on to Central Europe.
Product · Haulio

Haulio: transport management software that stops the retyping

A request arrives by email. Someone reads it, finds the client, checks the rates, types the order, creates the transport order and the CMR, and replies. 20 to 30 minutes, every time. Haulio does the reading and the typing. Your planner checks and confirms.

Haulio, simplified: a request email becomes a transport order and a CMR. Fictional example. Illustrative data
Manual20–30 min
read
client · rates
type order
transport order · CMR
reply
With HaulioAI draft + your check
AI draft
check
One transport request, start to finish. Manual time: 20 to 30 minutes, as measured in a forwarding office; yours may differ. The split between steps and the Haulio bar are illustrative. Illustrative data

What is inside

  • Inbox to order. Reads Outlook emails, matches client, stops and cargo, and prices from your rate cards.
  • Documents. Transport order and CMR from the confirmed order.
  • Client portal. Your client sees the status and downloads the CMR without calling you.
  • KPIs. Time to offer, win rate and lost requests per client.
  • TIMOCOM. Publish freight offers straight from the order.

Data & security

  • Hosted in the EU (Ireland). Each company's data is separated in the database itself, and administrators log in with two-factor authentication.
  • Clients never see your costs. Carriers never see your client price or internal notes.
Book a 30-minute demo We run it on one of your real emails.
Product in development · Vigila AI In development · Pilot wanted

Predictive maintenance for interlockings: we are building Vigila AI to flag a failing point machine weeks ahead

Most interlocking failures announce themselves: a motor that draws more current, a throw that takes longer, a supply that sags. The data is already in your diagnostics, and nobody has time to look at it. Vigila AI is in development. We are looking for a pilot station.

vigila · point machine W12 Demo
0246 A 0246 s normal · 3.9 s, 1.8 A today · 5.0 s, 2.4 A timeout
What Vigila AI is designed to flag. Point machine W12, motor current during one throw. Grey: learned normal. Red: today. Throw time up 28% in three weeks: a preventive alert, long before the 6 s timeout stops a train. Illustrative data

How it will work

  • Connects to interlocking diagnostics, point machines, track circuits, axle counters and power supplies (OPC UA, MQTT, Modbus, SNMP, log files).
  • Learns normal for every single asset, not one generic threshold for all.
  • Alerts in four levels: information, preventive, imminent, critical. Planned alert channels: SMS, email or Teams.
  • Answers questions from your own manuals through a local AI assistant, so a technician on site gets the right procedure.

What it will never do

  • Touch safety logic. It reads diagnostics and never sends commands.
  • Send your data anywhere. It is designed to run on a server inside your network.
Become our pilot station One station, measured results, then you decide.

From the signal box to the loading ramp — one team that speaks rail and code.

Who you will work with

Two founders. No account managers in between.

You talk directly to the people doing the work.

Diego Cuadrado Hipólito

Diego Cuadrado Hipólito

Co-founder · Railway projects & software
  • Civil engineer, specialised in transport.
  • More than 8 years on European railway infrastructure and signalling projects: project management, cost control, testing and commissioning.
  • Experience at the European Union Agency for Railways (ERA).
  • Designs and builds Haulio and Vigila AI.
LinkedIn
Jure Hrvatin

Jure Hrvatin

Co-founder · Freight transport
  • More than 10 years in freight transport.
  • Runs TOP Hrvatin (top-logistika.info), a freight forwarder with daily operations across Slovenia, Croatia and Central Europe.
  • Leads freight planning for our clients with Haulio.
  • Successfully implemented Haulio in his own forwarding company.
LinkedIn
Diego Cuadrado Hipólito and Jure Hrvatin at the Haulio stand at the Logistics Market Conference in Belgrade
Presenting Haulio at the Logistics Market Conference, Belgrade (Serbia), 2026

Vlak means train in Slovenian and Croatian, and Opti stands for optimal. The name is the brief: make rail, and the freight around it, work better.

Before you write

Questions about our rail consulting and software

Short answers. Ask us anything else directly.

What kind of railway projects do you support?

Infrastructure and signalling projects for contractors, infrastructure managers and suppliers: project management, cost control, installation management, and support for testing and commissioning. We agree scope and price after a short call.

Which rules and standards are you used to?

Our experience comes from European railway projects delivered under CENELEC standards, TSI CCS and ETCS/ERTMS, plus the national rules of each network.

Will Vigila AI interfere with the interlocking's safety logic?

No. Vigila AI is in development and is designed to only read diagnostic data and logs. It never sends commands, and it runs on a server inside your own network.

Where do you work?

Mainly in Slovenia and Croatia, and also in Serbia and Spain. Project support and software can be delivered remotely anywhere in Europe; on-site work by arrangement.

Where is Haulio's data stored?

On servers in the EU (Ireland). Each company's data is separated in the database itself, and administrators log in with two-factor authentication.

Will you sign an NDA?

Yes, before we see any drawings or data.

Contact

Tell us the problem. We reply with a plan.

The more we know, the more useful our first answer. This is what helps:

  • Type of project and current phase
  • What you need: management, cost control, installation or commissioning
  • Your timeline and key milestones
  • Where the project is
Email contact@optivlak.eu
Phone +34 695 721 862